Lifecycle Services
Design, delivery, operations
across every product
01
Assessment and design
Confirm workloads, equipment and site conditions, complete the system design and validate it in a digital-twin simulation.
02
Integration and validation
Prefabricated modules are integrated in the factory, with factory tests and interface checks.
03
Delivery and acceptance
On-site installation and commissioning, handed over after system testing.
04
Operations and expansion
Maintenance, repair and spares, operational tuning and ongoing expansion.
Sample schedule: an 8 MW phased delivery
Preconditions confirmedM0
Design and prefabricationM1–3
On-site installationM4–7
First POD in serviceM8
Remaining PODs deliveredM9–12
This schedule is an example. It assumes power connection, permits and site readiness are in place and major equipment lead times are secured, and it is not a delivery commitment.