We know compute.We bring it online faster.
SINOWISE · AI data centers, designed and delivered end to end
Global compliance
Compute anywhere,
built to local code
Rack, container and campus projects are specified with key components from the latest NVIDIA approved vendor list (AVL) and designed to the grid, certification and installation codes of the country they run in, from North America and Europe to Japan, Southeast Asia, the Middle East and Africa. Compliance documents ship with the equipment.
North AmericaUS, Canada · 60 Hz · NRTL (UL, ETL) · NEC · FCC
EuropeEU, UK · 50 Hz · CE / UKCA · EN 50600
Japan50 / 60 Hz · PSE · VCCI · seismic
South Korea60 Hz · KC certification · KEC
Southeast AsiaSingapore, Malaysia, Indonesia, Thailand, Vietnam, Philippines · national approvals
South AsiaIndia and more · 50 Hz · BIS registration
Middle EastSaudi Arabia, UAE, Qatar and more · SASO / SABER · G-Mark
AfricaSouth Africa, Kenya, Nigeria, Egypt and more · NRCS · PVoC · SONCAP
Latin AmericaMexico, Brazil, Chile and more · NOM · INMETRO · ANATEL
OceaniaAustralia, New Zealand · 50 Hz · RCM · AS/NZS 3000
Three product lines,
one method

Rack
Liquid-cooled racks
For teams that need liquid-cooled GPUs online fast. Compute and cooling are integrated, each rack is a self-contained compute unit, and both cold-plate and immersion options are available.
View liquid-cooled racks →
Container
SwiftMDC container data centers · Flagship
For owners who have a site and need AI capacity fast. Prefabricated in the factory, delivered as complete containers, expanding with the business.
View SwiftMDC →
Campus
Modular data halls and campuses
For operators converting a data hall to liquid cooling or building a campus. Built in phases and handed over turnkey, for new builds, retrofits and ongoing expansion.
View data halls and campuses →Delivered in weeks,
not years
Build what you need today.
Scale when you're ready.
From design to operations,
one team
Permits, construction, utility hookup: by the time a conventional data center goes live, the window has often passed. SwiftMDC is integrated and tested in the factory, arrives as a complete container and goes live once power and coolant are connected.
Don't pay today for capacity you'll need in three years. Start with one container, then add identical PODs as demand grows: the same building blocks scale from 80 kW to 20 MW.
Racks, containers and campuses follow one process: assessment and design, integration and validation, delivery and acceptance, operations and expansion, all handled by one team that knows compute.
faster than a conventional build
The conventional figure is a common industry estimate. The SwiftMDC figure is counted from when the site and power are ready.
Drag to set target IT power
Estimated from each configuration’s power ceiling, for illustration only; options outside their range are hidden.
Assessment and design
Requirements, equipment fit and digital-twin simulation
Integration and validation
Factory prefabrication and interface checks
Delivery and acceptance
On-site commissioning and handover
Operations and expansion
Maintenance, spares and ongoing expansion
Prove it in the twin,
then build it for real
Here, an old warehouse becomes an MGX 1.1 AI hall: racks, CDUs, power and contained cold aisles live in one model, with the airflow simulation already on. In-row coolers push cold air into the cold aisle, through the racks into the hot aisle and back to the coolers; streamline color shows air temperature.
Drag to rotate, double-click to zoom in, click a rack for details. In full screen you can switch deployment phases, run drills and inspect each rack.
DIGITAL TWIN · LOADING
Simulated data from a simplified airflow model, used to demonstrate deployment and operations; not measured results.
Your Site, Simulated
Run your own site in the twin
Tell us the site type, available power and cooling conditions. We'll build a digital twin of your site and walk you through it on a video call.
One POD in numbers
AI-Flex scales one POD at a time. Figures assume 8-GPU B300 servers.
Start with what you have.
We'll take it from there.
Data center operators
Add high-density GPU capacity in or next to existing halls and turn legacy rooms into AI-ready space.
Add AI capacity →Owners with land and power
Site and power ready? Bring SwiftMDC online one POD at a time, without waiting for a building.
Assess your site →GPU cloud providers and companies expanding into new regions
Stand up capacity in a new region fast: start with one container and grow with demand. Components come from the latest NVIDIA AVL and every system is built to local code.
Open a new region →Public sector and industrial parks
Metro and regional AI campuses, delivered end to end from master planning to operations.
Build an AI campus →News and insights

News · Nov 2026
SINOWISE launches worldwide compliance coverage, built on the latest NVIDIA AVL
Rack, container and campus projects are specified with components from the list and designed to the grid, certification and installation codes of ten regions worldwide.
Read more →
Blog · Nov 2026
Container data centers versus conventional builds: where they differ
Schedule, phasing and site conditions are the first three things to check.
Read more →
Blog · Nov 2026
Europe, the Middle East, Southeast Asia and Africa: data center compliance at a glance
CE and UKCA, SASO and G-Mark, national approvals and NRCS: what each region asks for.
Read more →Product Handbook
Every product line,
one handbook
Specifications, selection guidance and delivery scope in one PDF, easy to pass around your team.
Start with a site assessment
Tell us about the site, available power and target scale.